How to Manage Expectations with an LLM in the Mix
The shape of the problem
An LLM compresses the cheap part of a project, which is typing, and leaves the expensive parts alone: deciding, verifying, integrating. It also makes everything look faster, since the part that got fast is the only part anyone can see.
With an LLM, a plausible skeleton shows up in minutes, and the schedule gets set from the skeleton.
A slide-rule view: the first demo costs about a tenth of the calendar and looks like sixty to eighty percent of the product. The factor that moves this most is how much of the real work is exceptions and edge cases rather than the happy path. The more exceptions, the wider the gap.
Expectation 1: The demo is not the estimate
Say this out loud, early, and in writing: the first working demo is a drawing of the product, not a fraction of it. Ask the sponsor to hold all dates until the exception list exists.
The exception list comes from the person who handles all the exceptions today. Pair a junior business analyst with that person on day one. They carry the specification nobody wrote down, and an LLM will not ask them for it; it will guess and proceed with confidence.
Expectation 2: Typing got cheaper; reading did not
Code you write is code you understand. Code that arrives from a model has to be read cold, and reading someone else’s work is slower than writing your own. The volume is also higher. So the reviewer becomes the bottleneck.
Order of magnitude: typing time drops by ten; comprehension time barely moves. Budget for review as the main cost line, not as a closing step. If you have one senior reviewer, that person sets your throughput, not the model.
Expectation 3: The expensive bugs look correct
A human’s mistakes tend to look like mistakes. A model’s mistakes have the right shape and the right names and the wrong behavior. They survive review and surface in integration or production, where fixes cost the most.
Late discovery is the largest schedule multiplier in this kind of project, probably three to ten times on the affected items. The single number worth flagging to a sponsor is this one: any item first found wrong at integration should be costed at a multiple, not at face value.
Expectation 4: Tests come first, or nothing is verified
With a human team, tests are a by-product of someone understanding the code. With a model, tests are the evidence that the thing works. Write them first, or at least alongside, and treat them as the project’s real specification.
A team that leaves testing for the end discovers the whole problem at once, with the whole body of generated code needing checks at the same time. That is the project that runs long.
Expectation 5: There is no sprint boundary unless you build one
A sprint forces a scope cut, a demo and a retrospective on a fixed cadence. An LLM session has no natural end: one more tweak is always cheap in the moment, so work expands to fill the available tokens.
Impose the boundary yourself. Pick a time box and a defined set of passing checks, and stop when either one is reached. Write the stop condition down before the session starts, not during it, since the middle of a good run is the worst time to decide you have had enough.
What to tell the sponsor
Keep it short, and say it before the first demo, not after:
- The first demo will look nearly finished. It is not.
- The schedule gets set after the exception list exists, not before.
- Review and verification are the main cost, not generation.
- We will stop on a written condition, not on a feeling.
- Anything found wrong at integration costs several times what it would have earlier.
What to track
Three numbers are enough for a status call:
- Passing checks, and whether the count is growing.
- Items waiting on review, since that queue is the real throughput limit.
- Decisions written down versus decisions made.
If those three look healthy, the project is probably healthy, whatever the transcript volume says.
The one-sentence version
An LLM makes the cheap part of the project very fast and leaves the expensive parts untouched, so the manager’s job is to keep everyone from confusing the two.