Keyboard shortcuts

Press ← or → to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

Blessed by Everyone

A standard Gantt chart fits a project that involves an LLM poorly. The chart assumes the work is a list of tasks with known durations, done in order, and that building is the longest bar on it. With a model, building is the short part. The long parts are finding out what the business actually does, getting the people who know to confirm it, and reviewing the result, and none of those has a duration you can know in advance. They also repeat: questions lead to answers, answers lead to new questions, and a review can send part of the spec back. A plan that fits this kind of project is built around gates with conditions, not bars with dates. The gate described here is the most important one. It marks where coding starts, and the point where everyone involved has a stake in what gets built.

Nobody should generate anything but setup code and tests (throwaway prototypes excepted, and marked as such) until the spec has been blessed by everyone. At that point, submit the entire spec and everything else about the project to the best model available, for a project review.

A project manager reads “blessed by everyone” and hears a problem. The project is managed by one person, and that person is accountable for the date. If everyone has to agree, nobody can decide.

Both are true, because they are about different things. Everyone blesses facts. The project manager makes decisions.

What a blessing is

A blessing is one person confirming that the spec says what they told it. The rule they gave is written down correctly. The exceptions they handle are all there. Nothing they depend on is missing.

A blessing covers that person’s part, not the whole spec. It isn’t a vote, and it isn’t a veto. Accounts receivable blesses the invoice-matching rules. They don’t get a say in which network protocol the partner uses.

The word comes from testing, where blessing a result means accepting the program’s own output as the new expected answer. That check is only as good as the person who looked at the diff. Here the spec is what’s being checked, and the person who confirms it is the oracle. That is why a recorded blessing is worth more than a green checkmark.

Who “everyone” is

  • Each person who answered a question while the spec was written.
  • The people who will run the system and support it.
  • The people at the other end: the trading partner, the other department, the outside system’s owners.
  • Whoever pays for it. They bless that the spec matches what they agreed to buy. That is a fact about the agreement; changing the agreement is a decision, and it goes to you.

Not everyone in the building. If a person didn’t contribute a fact and won’t live with the result, they don’t need to bless anything.

What stays managed by you

  • The gate date. Blessings are collected by a deadline you set.
  • Conflicts. When two people’s answers disagree, someone with authority decides which one governs, and where the boundary between them sits. That’s you, or someone you name.
  • Scope. What’s in, what’s out, and what waits for the next release.
  • The review. What the reviewing model says is advice. You decide each point.
  • When it’s good enough. No spec is complete. You decide when it’s complete enough to build from.

What I have, what I need

Before the gate, get the people together and have each one say two things: what they have, and what they need from the others.

  • What I have: the answers I’ve confirmed, the parts I’ve blessed, what’s ready on my side.
  • What I need: the answer I’m waiting on, the decision that’s blocking me, the file I haven’t seen.

This shows the gaps between people, which a review of the spec can’t. If accounts receivable needs the partner’s guide and nobody has asked the partner, it tends to come out early. The “what I need” items become your list to chase before the gate opens.

How to run the gate

  1. Send each person their part. Not the whole spec. You may want to assign roles and responsibilities here: who owns each part, and who blesses it. Mark their answers, ask “Is this what you told us? Is anything missing?”, and give a date.
  2. Silence means unblessed. A rule that nobody confirmed is still a guess, so follow up until there’s an answer. If the gate date arrives and a part is still unblessed, you may choose to build on it anyway. Record that as an accepted risk, with your name and the reason.
  3. Record each blessing. Who, which part, when, and the commit of the spec they blessed, kept in the repository next to the spec. A blessing of text that has since changed is a blessing of something else.
  4. Hold the have-and-need meeting. Chase every “what I need” until it’s answered or deliberately put off.
  5. Package the whole thing. The spec, the questions and answers, the tests, the decisions and their reasons. Send the distillate, not the churn: the finished spec, not every chat that produced it. Before it goes, check that the package may leave the building; the first item in the security risks of Whoever is Good at It applies to this step more than to any other.
  6. Send it to the best model available, in a fresh session. Not the session that helped write the spec. It shares the spec’s blind spots. Ask what’s missing, what contradicts, and what will cause trouble.
  7. Decide every point. Accept it, reject it, or send it back to the person who owns that part. Write down the decision and the reason. When an owner revises their part, they bless the new version. Revising your own part is no failure; it’s how a spec gets finished properly.
  8. Open the gate. Building starts.

Setup code can come before the gate: the project skeleton, the build, the test harness. None of it makes a decision about the business, so none of it needs a blessing.

The tests come before the gate too. Let the model set up the tests for the spec’s rules, then read them all. Each test is a rule from the spec in a form that runs, so it is blessed with the part it belongs to and goes in the package.

After the gate

The spec will change. The builder will find things while writing tests, and some of them will mean the spec was wrong or incomplete.

A change doesn’t send the whole spec back through the gate. It goes to the people who own the part that changed, for a small blessing of their own, and the decision is recorded like the others. Everyone else carries on.

Finding those people is mechanical, since each blessing carries the commit it was given against. The parts that need a new blessing are the ones whose blessed version no longer matches the current text.

In short

Everyone blesses the part they own. You, the project manager, decide everything else, including when the gate opens.

Divider: star and jewels. A thin horizontal band. A gold line with a dashed turquoise line above and below fades out toward both ends. At the centre is an eight-point gold star between two ruby and two turquoise jewels.